All Specifications and drawing issued are unique to each Project. Below is a small listing of Assembly Drawings that are available. Please contact us with your Project Requirements and we will assist you with the proper application systems.
Problem: Wood joists and wood sub-floor required a 2 hour rating. The heat ducts, wiring and plumbing were in place as was the T-Bar ceiling. The cost to remove and re-install the ceiling tile system, ducting, wiring and plumbing to accommodate two layers of gypsum would have cost in the range of $150,000 Solution: Approved by the City of San Francisco. The coating was applied to all wood ceiling joists and sub-floor areas to provide the required 2 hour rating. A coating of Ff88, in matching color was applied to the ceiling to meet the fire rating required by the City. The work was completed in four working days and at a greatly reduced cost and less disruption. Problem: Non-fire rated (OSB) panels and 2X6 wall studs where used to construct exterior building shear walls at two structures at Pike Street. The panels did not meet the fire rating requirements as required by the City of Seattle. The extensive nailing of the panels to the stud walls, would have required re-framing four stories of exterior walls at both buildings. Solution: Based on testing on OSB board and wood timbers, the City of Seattle approved the use of the coating to coat the exterior OSB panels and exterior wall studs to meet the required fire rating thus preventing costly delays in construction and the need to rebuild all four stories of exterior walls. The cost savings for each building with the use of the coating was in the hundreds of thousands of dollars. Problem: The building was converted to condominiums above the first floor. The ceiling in the first floor had embossed tin ceilings requiring a 1 hour rating. To comply would have required removal of the ceiling, application of 2 layers of gypsum board and re-installation of the ceiling. The first floor area was extensive and occupied by a fabric store that was opened daily. The cost of demolition and reconstruction, including potential damage to the existing ceilingtiles, was extensive and would have required shutting down the store for a minimum of 4 weeks. Solution: Based on the coatings testing on embossed tin ceilings, we were approved and used to coat the embossed tin ceiling to provide the necessary 1 hour rating at a 60% reduction in cost. The labor was performed at night and completed in 7 work days with no disruption to the owner of the fabric store. |
Wood, Floor-Ceiling 30 min 1Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Wood | Floor / Ceiling | 30 Min | 10" TJ'I's @ 16" o.c. w/3/4" T&G OSB w/live load 40lbs | WFC30 |
Wood | Floor / Ceiling | 1-Hour | 2'x10" joists @ 16' o.c. w/3/4" T&G plywood flooring, span 12'-0", live load 40lbs | WFC101 |
Wood | Floor / Ceiling | 1-Hour | 2'x12" joists @ 16' o.c. w/3/4" T&G plywood flooring, span 12'-6", live load 100lbs | WFC102 |
Wood | Floor / Ceiling | 1-Hour | 2-1/2"x11-1/4" F/D joists@14" o.c. w/2 layers of 1-1/4" wood flooring, span 15'-0", live load 60lbs | WFC103 |
Wood | Floor / Ceiling | 1-Hour | 2"x 12" joists@16" o.c. w/3/4" T&G plywood flooring, span 14'-0", live load 40lbs | WFC104 |
Wood | Floor / Ceiling | 1-Hour | 4"x 13" F/D joists@16" o.c. w/3/4" T&G wood planking, span 17'-0", live load 40lbs | WFC105 |
Wood | Floor / Ceiling | 1-Hour | 11-7/8" TJ'I's @ 24" o.c. w/1-1/8" T&G plywood, 1-1/2" gypcrete, span 7' to 10', live load 60lbs | WFC106 |
Wood | Floor / Ceiling | 1-Hour | 11-7/8" TJ'I's @ 16" o.c. w/3/4" T&G plywood, 1-1/2" gypcrete, live load 40lbs | WFC107 |
Wood | Floor / Ceiling | 1-Hour | 14" TJ'I's @ 16" o.c. w/3/4" T&G plywood, span 20'-0"', live load 40lbs | WFC108 |
Wood | Floor / Ceiling | 1-Hour | 20" TJ'I's @ 16" o.c. w/3/4" T&G plywood, 2-1/2" concrete, live load 60lbs | WFC109 |
Wood | Floor / Ceiling | 1-Hour | 2" x 4" web trusses @24" o.c. w/3/4" T&G plywood, span by engineer, live load 40lbs | WFC110 |
Wood | Floor / Ceiling | 1-Hour | 8" x 13" beams @ 8' o.c., w/2" x 4" flooring stacked tight vertically, live load 40lbs | WFC111 |
Wood | Floor / Ceiling | 1-Hour | 4" x 12" beams @ 8' o.c., w/2" x6" T&G wood flooring, span 14', live load 40lbs | WFC112 |
Wood | Floor / Ceiling | 1-Hour | 4" x 14"F/D joists @ 12" o.c., w/2" x6" T&G wood flooring, span 18', live load 50lbs | WFC113 |
Wood | Floor / Ceiling | 1-Hour | 2" x 6"@ 24"o.c., w/1" x8" wood planking span 4'-0", live load 40lbs, w/built up floor above | WFC114 |
Wood | Floor / Ceiling | 1-Hour | 14" TJ's (metal tubing) @24" o.c. w/1-1/8" T&G plywood floor, 1-1/2" gypcrete, span 31-34', live load 60lbs | WFC115 |
Wood | Floor / Ceiling | 1-Hour | 28" TJ''s (metal tubing) @24" o.c. w/1-1/8" T&G plywood floor, 1-1/2" gypcrete, span 16', live load 60lbs | WFC116 |
Wood, Roof-Ceiling 1Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Wood | Roof / Ceiling | 1-Hour | 2" x 10" rafters @24' o.c. w/ 1/2" plywood, span 17', live load 20lbs | WRC101 |
Wood | Roof / Ceiling | 1-Hour | 4" x 10" beams @8' o.c. w/ 2" x 4" @24"o.c. w/ 1/2" plywood (beam span 10') live load 20lbs | WRC102 |
Wood | Roof / Ceiling | 1-Hour | 2" x 4" F/D rafters flat @ 16" o.c. over metal trusses @5' o.c., w/1/2" plywood, live load 20lbs, steel coating by others | WRC103 |
Wood | Roof / Ceiling | 1-Hour | 2" x 6" F/D rafters @24" o.c. , w/5/8" plywood, span 8', live load 20lbs | WRC104 |
Wood | Roof / Ceiling | 1-Hour | 2" x 6" rafters @24" o.c. , w/1" x 8" wood planking over metal trusses 94' o.c.) live load 20lb, steel coating by others | WRC105 |
Wood, Floor-Ceiling 2Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Wood | Floor / Ceiling | 2-Hour | 2" x 6" F/D joists @16" o.c. , w/1" x 8" wood planking , 2 layers 1/2" plywood, span 10', live load 40lbs | WFC201 |
Wood | Floor / Ceiling | 2-Hour | 2" x 8" F/D joists @16" o.c. , w/2 layers 1" " wood planking , live load 40lbs | WFC202 |
Wood | Floor / Ceiling | 2-Hour | 2"x 8" F/D joists @16" o.c. , w/ layer 1" wood planking, 3/4" T&G wood, span 10', live load 60lbs | WFC203 |
Wood | Floor / Ceiling | 2-Hour | 2"x 10" F/D joists @16" o.c. , w/ 1 layer 3/4" wood planking, 3/4" T&G wood, span 15', live load 40lbs | WFC204 |
Wood | Floor / Ceiling | 2-Hour | 2"x 10" F/D joists @16" o.c. , w/3/4" T&G plywood, span 10'-14', live load 40lbs | WFC205 |
Wood | Floor / Ceiling | 2-Hour | 1-1/2"x 13" joists @16" o.c. , w/1 layer 1" x 8" wood planking, 1 layer 3/4" T&G oak, span 24', live load 40lbs | WFC206 |
Wood | Floor / Ceiling | 2-Hour | 1-1/2"x 13" joists @16" o.c. , w/3/4" T&G plywood, w/ 3" concrete, span 7', live load 40lbs | WFC207 |
Wood | Floor / Ceiling | 2-Hour | 2" x 13-1/2" joists @ 16" o.c., w/1 layer 1" wood plank & 1 layer 1" T&G wood, span 20", live load 100lbs | WFC208 |
Wood | Floor / Ceiling | 2-Hour | 2" x 12" F/D joists @ 12" o.c. w/ 1" x 8" wood plank & 1 layer 3/4" T&G wood, span 17', live load 40 lbs | WFC209 |
Wood | Floor / Ceiling | 2-Hour | 1-3/4" x 12" mini lams @ 16" o.c./ 2" x 12" F/D joists @ 16" o.c., w/ 3/4" T&G wood floor, span 23', live load 60lbs | WFC210 |
Wood | Floor / Ceiling | 2-Hour | 2" x 12" F/D joists @16" o.c., w/ 3/4" T*G wood floor, span 14", live load 50lbs | WFC211 |
Wood | Floor / Ceiling | 2-Hour | 3" x 12" F/D joist @ 16" o.c., 1 layer 1" wood plank, 1 layer 1/2" OSB, 1 layer 3/4" T&G wood, span 10'-11', live load 100lbs | WFC212 |
Wood | Floor / Ceiling | 2-Hour | 3" x 14" F/D joists @16" o.c., 1 layer 3/4" wood plank, 1 layer 3/4" T&G wood, Span 15', live load 100lbs | WFC213 |
Wood | Floor / Ceiling | 2-Hour | 2" x 12" F/D joists @ 16" o.c. supported by steel I beams/1 layer 1" wood plank, 1 layer 3/4" T&G wood, span 10", live load 40lbs | WFC214 |
Wood | Floor / Ceiling | 2-Hour | 3" x 10" F/D joists @ 16" o.c., w/ 1" x 4" T&G wood floor with tile over mortar base, span 10', live load 40lbs | WFC215 |
Wood | Floor / Ceiling | 2-Hour | 3" x 10" F/D joists @ 16" o.c., w/ 3 layers pf wood flooring, @ 1-1/2" thick, span 20'-25', live load 60lbs | WFC216 |
Wood | Floor / Ceiling | 2-Hour | 3" x 12" F/D joists @ 16" o.c., w/ 1 layer 3/4" T&G wood flooring, span 16', live load 40lbs | WFC217 |
Wood | Floor / Ceiling | 2-Hour | 3" x 14" F/D joists @ 20" o.c., w/ 3/4" T&G OSB flooring, w/ 5/8" T&G oak flooring, span 24'-6"', live load 40lbs | WFC218 |
Wood | Floor / Ceiling | 2-Hour | 2-3/4" x 13-3/4" Beams @ 15" o.c. w/ 4layers of wood flooring, total 2-1/2", span 23'-24', live load 40lbs | WFC219 |
Wood | Floor / Ceiling | 2-Hour | 3" x 14" joists @ 16" o.c., w/3/4" T&G plywood, 1-1/4" gypcrete, span 16', live load 40lbs | WFC220 |
Wood | Floor / Ceiling | 2-Hour | 7-1/4" x 13" joists @50" o.c., w/ 3" wood planking, 3" concrete supported on double 6" x 15" beams, span 17', live load 60lbs | WFC221 |
Wood | Floor / Ceiling | 2-Hour | 8" x 12" F/D joists @ 8' o.c., w/ 3" x 6" T&G wood floor, span 25', live load 40lbs | WFC222 |
Wood | Floor / Ceiling | 2-Hour | 2" X 4" web trusses @ 19'-2" o.c., w/3/4" T&G plywood, span engineered, live load 60lbs | WFC223 |
Wood | Floor / Ceiling | 2-Hour | 3" x 10" F/D @ 16" o.c., w/multiple layers of wood @ 2-1/4" thickness, span 9', live load 60lbs | WFC224 |
Gypsum, Floor-Ceiling 1Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Gypsum | Floor / Ceiling | 1-Hour | 2" x 8" @16" o.c., w/ RC channel, w/ 3/4" T&G plywood, 1 layer 5/8" GWB, live load 40lbs | GFC101 |
Gypsum | Floor / Ceiling | 1-Hour | 2" x 10" @16" o.c., w/ RC channel, w/ 3/4" T&G plywood, 1 layer 5/8" GWB, live load 40lbs | GFC102 |
Gypsum | Floor / Ceiling | 1-Hour | 2" x 10" @24" o.c., w/ RC channel, w/ 3/4" T&G plywood, 1 layer 5/8" GWB, live load 40lbs | GFC103 |
Gypsum | Floor / Ceiling | 1-Hour | 8" TJI @19" o.c., w/ 1 layer 3/4" plywood, 1 layer 1/2" plywood, RC channel 24" o.c. or 1 layer 5/8" GWB, live load 40lbs | GFC104 |
Gypsum | Floor / Ceiling | 1-Hour | 11-7/8" TJI @16" o.c., w/ 1 layer 3/4" T&G plywood, 1 layer 5/8" GWB, live load 40lbs | GFC105 |
Gypsum | Floor / Ceiling | 1-Hour | 2" X 12" joists @ 16" o.c., w/1/2" plywood, 1/2" soundboard, 1-1/2" gypcrete, 1 layer 5/8" GWB, live load 40lbs | GFC106 |
Gypsum, Floor-Ceiling 2Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Gypsum | Floor / Ceiling | 2-Hour | 2" x 8" joists @ 24" o.c., w/2" x 6" T&G wood flooring, 1 layer 5/8" GWB, live load 40lbs | GFC201 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 8" joists @ 24" o.c., w/2" x 6" T&G wood flooring, 2 layers 5/8" GWB, live load 40lbs | GFC202 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 10" F/D joists @ 16" o.c., w/2 layers 3/4" wood flooring, 1 layer 1/2" GWB, 1-5/8" GWB | GFC203 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 10" F/D joists @ 16" o.c., w/3/4" T&G plywood, 1 layer 5/8" GWB, span 10'-14', live load 40lbs | GFC204 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 12" F/D joists @ 16" o.c., w/3/4" plywood, 1' T&G wood floor, 1 layer 3/4" GWB, 1 layer 5/8" GWB | GFC205 |
Gypsum | Floor / Ceiling | 2-Hour | 2-1/4" x 12" F/D joists @ 12" o.c., w/ 1" wood planking, 2" x 6" T&G wood floor, 1 layer 5/8" GWB | GFC206 |
Gypsum | Floor / Ceiling | 2-Hour | 2-3/4" x 12-3/4" F/D joists @ 12" o.c., w/ 3/4" wood floor, 1/2" RC channel, 1 layer 5/8" GWB | GFC207 |
Gypsum | Floor / Ceiling | 2-Hour | 1-3/4" x 12" F/D joists @ 16" o.c., w/2 layers 3/4" wood floor, 1/2" RC channel, Roxul mineral wool, 1 layer 5/8" GWB | GFC208 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 12" F/D joists @ 16" o.c., w2 layers 1" wood floor, 2 layers 5/8" GWB, span 13', live load 40lbs | GFC209 |
Gypsum | Floor / Ceiling | 2-Hour | 11-7/8" TJI's @ 16' o.c., w/3/4" T&G plywood w/ 2 layers 5/8" GWB | GFC210 |
Gypsum | Floor / Ceiling | 2-Hour | 11-7/8" TJI's @ 16' o.c., w/3/4" T&G plywood, 2" gypcrete , 1 layer 1/2" GWB, 1 layer 5/8" GWB | GFC211 |
Gypsum | Floor / Ceiling | 2-Hour | 12" TJI's @ 16" o.c., w/ 2 layers 3/4" plywood, 1 layer 1/2" type "X" GWB | GFC212 |
Gypsum | Floor / Ceiling | 2-Hour | 9-1/2" TJI's @ 24" o.c., w/5/8" T&G plywood, 2 laers 5/8" GWB, RC channel, 1 layer 5/8" GWB | GFC213 |
Gypsum | Floor / Ceiling | 2-Hour | 26" web trusses (metal tubing) 1-1/8" T&G plywood, 1 layer 1/2" GWB, 1 layer 5/8" GWB | GFC214 |
Gypsum | Floor / Ceiling | 2-Hour | 16" x 2" x 4" wood trusses @ 16" o.c., w/ 3/4" plywood, 3/4" gypcrete, RC channel, 1 layer 5/8" GWB | GFC215 |
Gypsum | Floor / Ceiling | 2-Hour | 24" x 2" x 4" wood web trusses @ 24" o.c., w/ 1-1/8" T&G plywood, RC channel, 2 layers 5/8" GWB | GFC216 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 4" wood trusses @ 24" o.c., 2 laers 3/4" plywood, 1/2" RC channel, Rosul mineral wool, 1 layer 5/8" GWB | GFC217 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 10" joists @ 16" o.c. w/ 2 layers 3/4" wood flooring, lowered 2" x 4" frame @ 16" o.c., 1 layer 1/2" GWB | GFC218 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 10" joists @ 16" o.c. w/ 3/4" wood flooring, lowered 2" x 4" frame @ 16" o.c., w/ 2 layers 5/8" GWB | GFC219 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 12" joists @ 16" o.c. w/ 3/4" wood flooring, lowered 2" x 4" frame @ 16" o.c., w/ 1 layer 5/8" GWB | GFC220 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 10" F/D joists @ 16" o.c., w/2 layers 3/4" wood flooring, 1/2" RC channel, Roxul mineral wool, 1 layer 5/8" GWB | GFC221 |
Gypsum | Floor / Ceiling | 2-Hour | 4" x 6" F/D joists @ 16" o.c., w/ 2 laers 3/4" wood flooring, 2 layers 5/8" GWB | GFC222 |
Gypsum | Floor / Ceiling | 2-Hour | 2" x 12" F/D joists @ 16" o.c., w/ 3/4" T&G wood floor, w/ lowered 2" x 4" ceiling @ 16" o.c., w/ 1 layer 5/8" GWB | GFC223 |
Gypsum, Roof-Ceiling 1Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Gypsum | Roof / Ceiling | 1-Hour | 2" x 12" @24" o.c., 1/2" GWB, 1/2"plywood, 1 layer 5/8" GWB | GRC101 |
Gypsum | Roof / Ceiling | 1-Hour | 2" x 6" @24" o.c., 1/2" GWB, 1/2" RC channel, 1 layer 5/8" GWB | GRC102 |
Gypsum, Wall 1Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Gypsum | Wall | 1-Hour | 2" x 4" studs @16" o.c., w/ 1/2" GWB. load bearing | GW101 |
Gypsum | Wall | 1-Hour | 2" x 6" studs @16" o.c., w/ 1/2" GWB 1 side, 3/8" plywood over 1/2" fiberboard-side 2 | GW102 |
Gypsum | Wall | 1-Hour | 2" x 4" wood studs @16" o.c., load bearing, w/ 1 layer 5/8" GWB each side | GW103 |
Gypsum | Wall | 1-Hour | 3-5/8" metal studs @ 16" o.c., non-load bearing, w/ layer of 5/8" GWB each side | GW104 |
Gypsum, Wall 2Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Gypsum | Wall | 2-Hour | 3-5/8" metal studs @ 16" o.c., non-load bearing, w/ 1 layer of 5/8" GWB each side | GW201 |
Gypsum | Wall | 2-Hour | 6" metal studs @16" o.c., non-load bearing, 1 layer 5/8" GWB each side | GW202 |
Gypsum | Wall | 2-Hour | 2" x 4" wood studs @16" o.c., load bearing w/ 1 layer 5/8" GWB each side | GW203 |
Gypsum | Wall | 2-Hour | 3-5/8" metal studs @ 16" o.c., w/ 1 layer 1/2" Durock GWB against 15" concrete wall | GW204 |
Gypsum | Wall | 2-Hour | 2" x 4" wood studs @16" o.c., (loaded @ 2250 lbs/stud) defective construction, 2 layers 5/8" GWB each side | GW205 |
Plaster, Floor-Ceiling 1Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Plaster | Floor / Ceiling | 1-Hour | 2" x 8" F/D joists @ 16" o.c., w/ 1/4" wood lath, 3/4" plaster, live load 40lbs | PC101 |
Plaster | Floor / Ceiling | 1-Hour | 2" x 10" F/D joists @ 16" o.c., w/ 1/4" wood lath, 3/4" plaster, live load 40lbs | PC102 |
Plaster | Floor / Ceiling | 1-Hour | 2" x 12" F/D joists @ 16" o.c., w/ 1/4" wood lath, 3/4" plaster, live load 40lbs | PC103 |
Plaster, Floor-Ceiling 2Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Plaster | Floor / Ceiling | 2-Hour | 2" x 8" F/D joists @ 16" o.c., w/ 1/4" wood lath, 3/4" plaster, span 10'-12' live load 60lbs | PC201 |
Plaster | Floor / Ceiling | 2-Hour | 2" x 10" F/D joists @ 16" o.c., w/ 1/4" wood lath, 7/8" plaster, live load 40lbs | PC202 |
Plaster | Floor / Ceiling | 2-Hour | 2" x 12" F/D joists @ 16" o.c., w/ 1/4" wood lath, 3/4" plaster, live load 40lbs | PC203 |
Plaster | Floor / Ceiling | 2-Hour | 2" x 12" F/D joists @ 12" o.c., w/ 1/4" wood lath, 1" plaster, span 18' , live load 60lbs | PC204 |
Plaster | Floor / Ceiling | 2-Hour | 2" x 16" F/D joists @ 16" o.c., w/ 1/4" wood lath, 7/8" plaster, span 26', live load 60lbs | PC205 |
Plaster / Gypsum, Floor-Ceiling 2Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Plaster / Gypsum | Floor / Ceiling | 2-Hour | 2" x 8" F/D joists @ 16" o.c., w/ 1/4" wood lath, 1/2" plaster,, 1 layer 5/8" GWB, live load 40lbs | GPFC201 |
Plaster, Wall 1Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Plaster | Wall | 1-Hour | 2" x 4" F/D wood studs @ 16" o.c., w/ 1/4" wood lath, 1/2" plaster | PW101 |
Plaster | Wall | 1-Hour | 2" x 4" F/D wood studs @ 16" o.c., w/ 1/4" wood lath, 3/4" plaster | PW102 |
Plaster, Wall 2Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Plaster | Wall | 2-Hour | 2" x 4" F/D wood studs @ 16" o.c., w/ 1/4" wood lath, 1/2" plaster | PW201 |
Plaster | Wall | 2-Hour | 2" x 4" F/D wood studs @ 16" o.c., w/ 1/4" wood lath, 3/4" plaster | PW202 |
Embossed Tin, Floor-Ceiling 1Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Embossed Tin | Floor / Ceiling | 1-Hour | 4" x 12" F/D joists @12" o.c., w/2 layers 3/4" wood floor, 1" x 3" wood spacers, embossed tin | TC101 |
Embossed Tin | Floor / Ceiling | 1-Hour | 2" x 12" F/D joists @16" o.c., w/1" x 6" T&G floor, 1" x 3" wood spacers, embossed tin | TC102 |
Embossed Tin | Floor / Ceiling | 1-Hour | 2" x 12" F/D joists @16" o.c., w/2 layers of wood floor, 1-3/4" thick w/ 1/4" wood lath, 3/4" plaster, embossed tin | TC103 |
Embossed Tin | Floor / Ceiling | 1-Hour | 2" x 12" F/D joists @16" o.c., w/2 layers wood floor, 1-3/4" thick, 1" x 4" wood spacers, embossed tin | TC104 |
Embossed Tin | Floor / Ceiling | 1-Hour | 2" x 12" F/D joists @16" o.c., w/2 layers wood flooring, 1 layer 3/4" wood under embossed tin | TC105 |
Embossed Tin | Floor / Ceiling | 1-Hour | 2" x 13" F/D joists @ 12" o.c., w/ 2 layers of wood floor, 1-3/4" thick w/ 1" x 3" spacers, embossed tin | TC106 |
Embossed Tin | Floor / Ceiling | 1-Hour | 2" x 10" F/D joists @ 12" o.c., w/ 2 layers of 3/4" wood flooring, w/ 1" x 2" spacers, embossed tin | TC107 |
Embossed Tin | Floor / Ceiling | 1-Hour | 2" x 10" F/D joists @ 12" o.c., w/ 2 layers of 1" wood flooring, w/ 1/4" wood lath, 3/4" plaster, 1" x 3" spacers, embossed tin | TC108 |
Embossed Tin | Floor / Ceiling | 1-Hour | 3" x 8" F/D joists @16" o.c., w/ 1 layers T&G wood, 3/4" gypcrete, 3/4" T&G floor, 1" spacers, embossed tin | TC109 |
Embossed Tin, Floor-Ceiling 2Hr
Substrate | Roof / Floor / Ceiling | Time | Assembly | FF File No. |
---|---|---|---|---|
Embossed Tin | Floor / Ceiling | 2-Hour | 3" x 14" F/D joists @ 22" o.c., w/ 1 layer 5/8" T&G pine floor, 1/4" lath, 7/8" plaster, embossed tin | TC201 |
Embossed Tin | Floor / Ceiling | 2-Hour | 3" x 16" F/D joists @ 20" o.c., w/ 2 layers of wood floor 1-3/4" , 1/4" lath, 3/4" plaster, embossed tin | TC202 |
Embossed Tin | Floor / Ceiling | 2-Hour | 3" x 10" LVL's sistered @24" o.c., w/3/4" T&G plywood floor, w/ 3/4" T&G wood ceiling, embossed tin | TC203 |
Embossed Tin | Floor / Ceiling | 2-Hour | 2" x 12" F/D joists @ 16" o.c., w/ 2 layers 3/4" wood floor, 1" x 3" spacers, embossed tin | TC204 |
Embossed Tin | Floor / Ceiling | 2-Hour | 2" x 13" F/D joists @ 12" o.c., w/ 2 layers wood flooring 1-3/4", w/ 1" x 3" spacers, embossed tin | TC205 |
Embossed Tin | Floor / Ceiling | 2-Hour | 2" x 16" F/D joists @ 16" o.c., w/ 2 layers wood flooring 2", w/ 1" x 3" spacers, embossed tin | TC206 |
Embossed Tin | Floor / Ceiling | 2-Hour | 2" x 10" F/D joists @ 16" o.c., w/ 1 layerof 1" wood flooring, w/ 1" x 3" spacers, embossed tin | TC207 |
Embossed Tin | Floor / Ceiling | 2-Hour | 2" x 10" F/D joists @ 16" o.c., w/ 3/4" T&G wood flooring, w/1/4" wood lath, 3/4" plaster, embossed tin | TC208 |
Embossed Tin | Floor / Ceiling | 2-Hour | 2" x 10" F/D joists @ 16" o.c., w/ 2 layers of 3/4" T&G wood flooring, w/1/4" wood lath, 3/4" plaster, embossed tin | TC209 |